XVI International Music Exhibition
September 23-26, 2010,
CEC "Sokolniki"

Hall № 3 (Silent)

EQUIPMENT. TECHNOLOGIES. INSTALLATIONS

Sound demonstrations are forbidden!!!

Technical specifications  
   

S gross weight 2116 м2
S net weight 2002 м2
Length 46 м
Width 46 м
Height 7,5/9,45 м
  Assembly gates:
  height 6 м
  width 5 м
Allowed load on the floor not more than 2,5 t/m2 
Total electric power in the hall not more than 2000 kWt (220/380V, 50 Hz).
In any point of the hall the supply of water drainage, electricity, and phone installation is possible. Also it is possible to spend cargo handling works with the help of the crane. One square on the plan is equivalent 1 м2.

Floor plan


TECH. PARTNER
OPERATOR
INTERNET PARTNER
General Information Sponsor